Click here for a FREE 30 MIN CONSULT—Because Even Genius Toy Ideas Need a Sidekick! 🦸♂️🎯

Research and Ideation for Toy Development in China
In this first phase we validate your toy idea as a Minimum Viable Product (MVP) and prepare a concise, living Product Requirement Document (PRD v1.0). We align the core fun with a realistic cost target and age grading, open factory conversations on materials and mold paths, and consider compliance early (EN 71 / ASTM F963 / CPSIA) so the concept is buildable, safe, and ready for the next phase.
Best for
Founders & inventors
New IP or play pattern that needs a clear build path and guardrails.
Brand & line owners
Early de-risking before committing design and tooling budgets.
Non-brand toys
Entering toys with guidance on compliance, safety, and age grading.
What you'll achieve
MVP defined
Smallest lovable feature set that fits MSRP, age grade, and user experience.
Feasibility validated
Factory pre-talks on materials, mold count, mechanisms & NRE.
Compliance-aware
Early view on age grading and likely test routes (EN 71/ ASTM F963 / CPSIA).
From sketch to buildable concept
From idea to core features that fit cost & age grade, drafting a first PRD draft.
Materials & toys discussion with a manufacturing partner.
Pre-compliance check for an RC car.
Your deliverable: PRD v1.0 (single source of truth)
A concise document that captures what we are building and the constraints it must meet-used by design, engineering, sourcing, testing and production.
What we'll do
-
MVP framing
(inclusions/exclusions, target MSRP, age grade) -
Inspiration scan (what to borrow or avoid)
-
Factory pre-talks (materials, mold paths, constraints)
-
Feasibility notes
(mechanisms, tolerances, assembly) -
Early compliance view (EN 71 | ASTM F963 / CPSIA)
-
Draft the PRD v1.0
What you'll provide
-
Idea description or sketch (links/pictures are fine)
-
Target retail price & markets
(EU/US/UK/AU) -
Desired age grade & play pattern
-
Must-use/avoid components or materials
-
Launch window / deadlines
-
(Optional) Your factory contact
What you'll get (PRD v1.0)
-
Purpose & scope, assumptions, risks
-
Functional requirements (play features, interactions)
-
Non-functional targets (cost band, durability, runtime, sound, etc.)
-
Safety & compliance requirements by market/age grade
-
Early BOM sketch & materials map
-
Acceptance criteria & out-of-scope list
-
Factory shortlist with notes + next-phase plan (ID/ME)
The PRD is updated as decisions are made in later phases.
Process & timeline (2-4 weeks)
⚠️ Reference only: timing varies with complexity, decision speed, and supplier calendars.
1
Week 1
Kickoff, goals & constraints • MVP framing - Initial factory outreach
2
Weeks 2-3
Concept shaping • Feasibility checks (materials, molds, mechanisms) - Compliance lens
3
Weeks 3-4
Finalize PRD v1.0 • Factory shortlist & next-phase scope
(ID/ME)
FAQs
Why start with an MVP?
What exactly is in PRD v1.0?
How long does Research & Ideation take?
Can you work with our existing factory?
How early do you consider compliance?
Do you sign MNDA/NNN?
What happens after PRD v1.0?